127
edits
Changes
→Steel Bridge Building Team
==Steel Bridge Building Team==
The steel bridges we build are roughly 19 to 21-feet long . Many dimensional constraints and involve many processesassembly guidelines apply to the bridge’s design and assembly strategy, including computer modellingthough these are only revealed in the competition mailers once teams are registered. One such example was a river flowing through the center of the construction site, connection designforcing teams to assemble their bridges on either side of the river and having both ends meet in the middle. Once assembled, sawing, weldingthe bridges are then loaded with a specified loading pattern both laterally and vertically, and assembly practicedeflections are recorded at various locations along the span to determine the bridge’s efficiency. A highly complex undertaking, we have overcome adversity to compete the last two years. In the 2017-2018 season, our team is excited to learn from our past and create our best steel bridge yet!
===Competition Results===
The Canadian National Steel Bridge Competition is a newly created competition, where universities from all over Canada compete by attempting to build the most efficient steel bridges.The final bridges are ranked on multiple criteria, including speed of assembly, architectural design, weight, and deflection.
*2015-2016: 1 Steel Bridge Team [TEAM SIZE: 12]
**4th Place at first ever CNSBC, 3rd for Architectural design