Template:In progress
McGill Bridge Building Team
![BridgeBuildingLogo.png](/images/thumb/9/9b/BridgeBuildingLogo.png/300px-BridgeBuildingLogo.png) |
About |
---|
Wood Team Captain |
Adamo Bernola |
---|
Steel Design Captain |
Ziyi Gu |
---|
Steel Fabrication Co-Captain |
Rosie Gonzales |
---|
Sponsorships Co-Captain |
Caroline Deschamps |
---|
Finance Co-Captain |
Ying Wang |
---|
Visibility Co-Captain |
Liliane Gonthier |
---|
Media Co-Captain |
Daniel Dickson |
---|
Website |
Facebook |
Linkedin |
|
The McGill Bridge Building Team is an engineering design team that centers on designing and building bridges in either wood or steel for multiple engineering competitions. We welcome undergraduate students from diverse backgrounds to join us in managing exciting challenges through unique solutions. Our holistic mission is to provide our team members with practical, hands-on design experience to strengthen their understanding of in-class concepts, and foster creativity. So far, we’ve built a total of 14 wooden and 2 steel bridges.
Wood Bridge Building Team
Competition Results
- 2013-2014: 1 Wood Bridge Team [TEAM SIZE: 6]
- 10th Place in the 30th Annual CSCE Troitsky Bridge Building Competition
- 1st Place Aesthetics
- 2014-2015: 3 Wood Bridge Teams [TEAM SIZE: 16]
- 2015-2016: 5 Wood Bridge Teams + 1 Steel Bridge Team [TEAM SIZE: 30]
- 4th Place at Troitsky (4 teams in top 10!)
- 4th Place at first ever CNSBC, 3rd for Architectural design
- 2016-2017: 3 Wood Bridge Teams + 1 Steel Bridge Team [TEAM SIZE: 30]�
- 5th Place at Troitsky
- Maximum load carried of 4850 lbs
Steel Bridge Building Team
- 2015-2016: 1 Steel Bridge Team [TEAM SIZE: 12]
- 4th Place at first ever CNSBC, 3rd for Architectural design
- 2016-2017: 1 Steel Bridge Team [TEAM SIZE: 12]
History
Text
<tabs container="width:500px">