Bridge Building

From EUSwiki
Revision as of 11:37, 12 January 2018 by Wiki.guest (talk | contribs)
Jump to: navigation, search

Template:In progress

McGill Bridge Building Team
BridgeBuildingLogo.png
About
Wood Team Captain Adamo Bernola
Steel Design Captain Ziyi Gu
Steel Fabrication Co-Captain Rosie Gonzales
Sponsorships Co-Captain Caroline Deschamps
Finance Co-Captain Ying Wang
Visibility Co-Captain Liliane Gonthier
Media Co-Captain Daniel Dickson
Website
Facebook
Linkedin

The McGill Bridge Building Team is an engineering design team that centers on designing and building bridges in either wood or steel for multiple engineering competitions. We welcome undergraduate students from diverse backgrounds to join us in managing exciting challenges through unique solutions. Our holistic mission is to provide our team members with practical, hands-on design experience to strengthen their understanding of in-class concepts, and foster creativity. So far, we’ve built a total of 14 wooden and 2 steel bridges.

Wood Bridge Building Team

On Wood Team, we build smaller scale, design-oriented projects using only popsicle sticks, glue, and dental floss. We always promote using new techniques and improvements towards building innovative bridges.
Troitsky Competition 2016

Competition Results

  • 2013-2014: 1 Wood Bridge Team [TEAM SIZE: 6]
    • 10th Place in the 30th Annual CSCE Troitsky Bridge Building Competition
    • 1st Place Aesthetics
  • 2014-2015: 3 Wood Bridge Teams [TEAM SIZE: 16]
    • Maximum load of 921 lbs
  • 2015-2016: 5 Wood Bridge Teams + 1 Steel Bridge Team [TEAM SIZE: 30]
    • 4th Place at Troitsky (4 teams in top 10!)
    • 4th Place at first ever CNSBC, 3rd for Architectural design
  • 2016-2017: 3 Wood Bridge Teams + 1 Steel Bridge Team [TEAM SIZE: 30]
    • 5th Place at Troitsky
    • Maximum load carried of 4850 lbs

Steel Bridge Building Team

The steel bridges we build are 21-feet long and involve many processes, including computer modelling, connection design, sawing, welding, and assembly practice. A highly complex undertaking, we have overcome adversity to compete the last two years. In the 2017-2018 season, our team is excited to learn from our past and create our best steel bridge yet!

Competition Results

The Canadian National Steel Bridge Competition is a newly created competition, where universities from all over Canada compete by attempting to build the most efficient steel bridges.

  • 2015-2016: 1 Steel Bridge Team [TEAM SIZE: 12]
    • 4th Place at first ever CNSBC, 3rd for Architectural design
  • 2016-2017: 1 Steel Bridge Team [TEAM SIZE: 12]
    • 5th Place at CNSBC

SteelTeamMBB.jpg

History

Text

<tabs container="width:500px">
2016-2017 Executive Team
Position: Name:
Wood Team Captain Andrea Leone
Steel Team Captain David Benson
Steel Fabrication Co-Captain Terry Vourdousis
Sponsorships Co-Captain Caroline Deschamps
Visibility Co-Captain Dominique Cliche
Media Co-Captain Dan Delcy
2015-2016 Executive Team
Position: Name:
Team and sponsorships captain Eric Shehata
Wood Team Co-Captain David Benson
Steel Design Co-Captain Rico Massa
Steel Construction Co-Captain David Pizzuto